24” & 16” Water Main Replacement Richards Road and Dorr Street
City of Toledo
ESA was responsible for the survey, design and construction phase engineering for this project. The project consisted of replacing 2,871 feet of 24” ductile iron waterline and 4,065 feet of 16” ductile iron waterline and abandoning the existing 24” and 16” steel waterline along this route.