Student Recreation Center Renovation & Addition
Bowling Green State University
Project Dates: 2013 – 2014
ESA was the lead Civil Engineer on this renovation/addition to the existing Student Recreation Center at Bowling Green State University. Site design included new parking and entrance drives, storm drainage, and sanitary and water services to the building. Preparation of specifications for trenching and installation of site utilities (storm, water, sanitary & gas). Prepared erosion and sediment control plan and storm water pollution prevention plan. Review of utility and pavement design shop drawings.