bureau-of-criminal-investigation-bgsu-bowling-green-ohio
  • Topographic survey and site design for this project.
  • Site design included new parking and entrance drives, storm drainage, and sanitary and water services to the building.
  • Storm drainage required the use of an underground storage system due to the tight site constraints.
  • Storm calculations included evaluation of the existing storm sewer system to determine allowable runoff.

Services Provided