  • Complete site design for new building consisting of 124,503 sf built adjacent to existing High School
  • Design included new utility services: water, sanitary and storm along with new sanitary service to the existing High School
  • Modified existing entrances and access drives along with traffic patterns.
  • Storm drainage included a 45,000 cubic foot detention pond with a water quality structure and a storm water pump station.

Project met LEED certification requirements.