Lake High School, Millbury, Ohio
  • Site demolition with the goal of reusing as much as possible to control construction costs.
  • Evaluation of existing campus utilities to serve the new facility.
  • Evaluation and calculations included the existing campus storm system and detention pond.
  • Modifications to existing traffic patterns.
  • New onsite water, sanitary and storm systems with modifications to existing campus systems.
  • New Locker Room building with new water, sanitary and storm services.

Services Provided